Undocking of Jalashwa V
Jalashwa 5 Launched 1500 Hrs after completing Dry Dock Repair Works.
Jalashwa 5 Launched 1500 Hrs after completing Dry Dock Repair Works.
Free medical camp for the employees and public conducted. Sea Blue Shipyard Ltd in association Welcare Hospital Vytila
The vessel Oil Barge “Nine Ocean” Docked. LOA – 58.21m, Draught – 2.90m
Barge Nine Ocean Berthed at 1546 HRS (58 M Length x 14 M Breadth x 2.90 M Draft)