Berthing of ICGS Achook
Berthing of ICGS Achook
First Version Docking of ICGS Arnvesh
ICGS Arnvesh Dry Docking (Version 1)
Berthing of ICGS Arnvesh
ICGS Arnvesh Berthed for Normal Refit
Sailing of Jalashwa V
“Jalashwa V” sailed out from Sea Blue Shipyard today at 1645hrs.
Undocking of Jalashwa V
Jalashwa 5 Launched 1500 Hrs after completing Dry Dock Repair Works.
Medical Camp
Free medical camp for the employees and public conducted. Sea Blue Shipyard Ltd in association Welcare Hospital Vytila
Dry-docking of vessel MUC Jalashwa V
DRY DOCK REPAIR OF MUC JALASHWA-V
Balloon Docking of Tug Amrut 55
The Tug Amrut 55 Docked by Balloons
Drydocking of MV Nine Ocean
The vessel Oil Barge “Nine Ocean” Docked. LOA – 58.21m, Draught – 2.90m
Berthing of Nine Ocean
Barge Nine Ocean Berthed at 1546 HRS (58 M Length x 14 M Breadth x 2.90 M Draft)
Undocking of Pearl of Periyar
LAG Barge launched after dry dock repair works
Undocking of ICGS Rajdoot
Indian Coast Guard’s Fast Petrol Vessel ICGS Rajdoot undocked after completing Underwater Routines
Coast Guard Visit
Coast Guard officials visited the shipyard for accessing yard facilities
FACT Barge Pearl of Periyar
Barge Pearl of Periyar docked for Annual Survey Routines
Docking of ICGS C-148
Indian Coast Guard vessel ICGS C 148 docked Underwater Routines
Docking of ICGS Rajdoot
Indian Coast Guard vessel ICGS Rajdoot docked for version II underwater routines
Undocking of ICGS Kasturba Gandhi
Indian Coast Guard’s Fast Petrol Vessel ICGS Kasturba Gandhi Undocked after Version