Undocking of Jalashwa V
Jalashwa 5 Launched 1500 Hrs after completing Dry Dock Repair Works.
Medical Camp
Free medical camp for the employees and public conducted. Sea Blue Shipyard Ltd in association Welcare Hospital Vytila
Drydocking of MV Nine Ocean
The vessel Oil Barge “Nine Ocean” Docked. LOA – 58.21m, Draught – 2.90m
Berthing of Nine Ocean
Barge Nine Ocean Berthed at 1546 HRS (58 M Length x 14 M Breadth x 2.90 M Draft)
Undocking of ICGS Rajdoot
Indian Coast Guard’s Fast Petrol Vessel ICGS Rajdoot undocked after completing Underwater Routines